THE SINGARENI COLLIERIES COMPANY LIMITED
(A Government Company)
Singareni Bhavan, P.B.No. 18, Red Hills, Khairatabad P.O.,
Hyderabad –500 004
Phone Nos. : 23393706/23316171/23397775: Fax – 040-23307653
PRICE NOTIFICATION NO. 36/2012-13
As per the Gazette Notification No. 22021/1/2008-CRC-II, DT. 30.12.2011 issued by Government Of India to switch over from UHV based gradation system to GCV based system and in pursuance of the Colliery Control Order 2000, issued by the Govt. of India on 1st January 2000 in supersession of our earlier PRICE NOTIFICATION NO. 35/2012-13, dt. 3.4.2012, following are the revised Grade- wise GCV based Basic prices of Run of Mine (ROM) coal of the Singareni Collieries Company Limited, excluding statutory levies w.e.f. “00.00” hours of 14.9.2012.
I.
Grade of Coal |
Gross Calorific Value per Kilo Calories / per Kilogram |
ROM Coal (in Rs.) |
G1 |
Above 7000 |
3896 |
G2 |
6701 to 7000 |
3733 |
G3 |
6401 to 6700 |
3569 |
G4 |
6101 to 6400 |
3336 |
G5 |
5801 to 6100 |
3319 |
G6 |
5501 to 5800 |
2360 |
G7 |
5201 to 5500 |
1840 |
G8 |
4901 to 5200 |
1700 |
G9 |
4601 to 4900 |
1500 |
G10 |
4301 to 4600 |
1400 |
G11 |
4001 to 4300 |
1130 |
G12 |
3701 to 4000 |
910 |
G13 |
3401 to 3700 |
690 |
G14 |
3101 to 3400 |
610 |
G15 |
2801 to 3100 |
510 |
G16 |
2501 to 2800 |
474 |
G17 |
2201 to 2500 |
420 |
II. Basic prices of Washery Grade coal per tonne:
Washery Grade G9 = Rs.2778
Washery Grade G11 = Rs.1690
Washery Grade G13 = Rs.1490
Washery Slurry = Rs. 427
Washery Rejects = Rs. 738
III. The additional price of JK-5 OCP project (cost plus), Yellandu Area is Rs.258.69 over and above the notified basic price of the relevant grades of coal
IV. The additional price of KTK Longwall Project, Bhoopalpalli area, is Rs.407.18 per tonne over and above the notified basic price of the relevant grades of coal.
V. Notes:
1. Run of Mine coal is coal comprising of all sizes which comes out of the mine without any crushing or screening.
2. The fraction of the Run of Mine coal as is retained on a screen when subjected to screening OR is picked out by fork shovel during loading is called Steam coal.
3. The fraction that remains after Steam Coal has been removed from the Run of Mine coal is called Slack coal.
4. When the top size is limited to any maximum limit within the range of 200 – 250 mm through manual facilities or mechanical facilities is called Crushed ROM Coal.
5. Additional Rs.20/- shall be charged on pithead price of Run of Mine coal for the supply of Slack coal.
6. Additional of Rs.220/- shall be charged on pithead price of Run of Mine Coal for the supply of Steam Coal.
7. Where the top size is being limited to any maximum limit within the range of 200 mm – 250 mm through manual facilities of mechanical means, a charge at the rate of Rs.60/- per tonne will be levied in addition to the price applicable for Run of Mine coal.
8. Additional crushing charges of Rs.6/- per tonne for (-) 100 mm size coal will be levied which would be over and above the existing grade crushing charges for (-) 200 mm size.
9. When coal is loaded either into Indian Railway Services OR into the Purchaser’s own system of transport through high capacity loading system with a nominal capacity of 3500 Tonnes per hour or more, additional charges of Rs.20/- per tonne will be levied for such loading w.e.f. 30.3.2010.
10. Where coal is transported from pithead to the loading points additional transport costs, will be collected extra from the purchasers at the following rates.
DISTANCE |
STC RATE |
0 – 3 Kms |
Rs.17/- per tonne |
Distance more than 3 Kms, but not more than 10 Kms |
Rs.44/- per tonne |
Distance more than 10 Kms, but not more than 20 Kms |
Rs.77/- per tonne |
Distance more than 20 Kms |
Actual Transport charges including the expenditure incurred towards repair & maintenance of roads leading to SCCL loading points subject to a minimum of Rs.77 per tone. |
Mode of transport like Conveyor, Aerial, Ropeway etc., are included for levy of Surface Transport Charges.
11. The Pit-head prices fixed are exclusive of Royalty, cess, taxes and levy, if any, levied by the Govt., Local authorities or other Bodies, duties of excise and Sales Tax from time to time.
12. For undertaking special sizing or benefication of coal, additional charges as may be negotiated between the Purchaser and SCCL will be realized over and above the notified prices.
13. Premium prices applicable to the concerned dispatch points and other charges like royalty, forest land adjustment cost, Fuel Surcharge, Clean Energy Cess, pre-weigh-bin charges, stowing excise duty are chargeable over and above the notified price.
14. Forest Land adjustment cost and forest permit fee will be levied at Rs.27/- per tonne for all grades of coal including un-graded coal w.e.f. 30.7.2011.
15. Pre-weigh bin charges at Rs.25/- per tonne will be levied at all Road & Rail dispatch points where coal is delivered through pre-weigh bins.
16. Shunting charges @ Rs.15/- per tonne will be levied for the customers for whom coal is being despatched through Rail mode w.e.f. ‘00-00’ hours of 30.7.2011.
17. SCCL will charge Rs.692.70 extra per tonne over and above the notified price from 1.4.2011 in respect of the coal produced from OC-II mine of Ramagundam.
18. Fuel Surcharge will be levied at Rs.86/- per tonne w.e.f. ‘00-00’ hours of 14.9.2012.
19. Clean Energy Cess will be levied at Rs.50/- per tonne w.e.f. ‘00-00’ hours of 1.7.2010 as per the Govt. of India, Ministry of Finance Notification Nos.01/2010 to 06/2010.
Chief General Manager
(Marketing)