Creating conditions congenial to local fauna.No siltation in water bodies in the vicinity.Increasing aesthetic look of the dumped areas.

Overburden reclamation with Biological Engineering process where in the engineering structures complement early establishment of Soil and Biomass and reducing adverse impact on the local Eco-system.Overburden reclamation with Biological Engineering process where in the engineering structures complement early establishment of Soil and Biomass and reducing adverse impact on the local Eco-system.Providing better ground for natural regeneration of the flora and early start of natural succession. Biological Engineering of OB Dumps

Manuguru OC-II dumps before reclamation(2002)

Successful reclamation efforts
Same dumps after reclamation (2004)
Same dumps after reclamation (2006)
Engineering Biological
Top Soil Management
Preserving
Mounds on top of decks
Layer on the slopes
Macro treatment
Protection of area
Introduction of pioneers
Planting suitable native species
Terracing
Slope
Deck size
Micro treatment

VAM
Rhizobium
Azatobactor
vermicompost
SMC works
Toe walls
Gabions
Rock filled dams
Cribs
Drainage channels
Garland canal
Vegetative barriers
Agave
Babool
Henna
Vetiveria
Ipomea